Introduction of STEEL REINFORCEMENT MESH
Steel reinforcement mesh has longitudinal and transverse at a certain distance and angles. Then all intersections are welded together.
Also has other names, steel bar welded mesh, welded steel bar mesh, steel welded mesh, and so on.
Reinforcement mesh classification:
Shaped reinforcement mesh and customized reinforcement mesh according to the grade, diameter, length and spacing of the reinforcement.
- Cold rolled ribbed wire mesh,
- cold drawn round reinforced wire mesh,
- hot rolled ribbed wire mesh.
- Among them, cold-rolled ribbed wire mesh is widely used.
Steel Reinforced welded mesh, construction welded mesh, ribbed welded mesh, coal mine welded mesh, coal mine embossed mesh welded mesh, stainless steel welded mesh, decorative mesh, ribbed reinforcement, hoop, Brick mesh, welded mesh, geothermal mesh, etc.
Reinforcing mesh sizes details (2.4m x 4.8m)
BS Ref. | Size (mm) | Pitch (mm) | Area (mm2/m) | Size (mm) | Pitch (mm) | Area (mm2/m) | Kg/m² | Kg/sheet | Sheets per Tonne |
A142 | 6 | 200 | 142 | 6 | 200 | 142 | 2.22 | 25.57 | 39 |
A193 | 7 | 200 | 193 | 7 | 200 | 193 | 3.02 | 34.79 | 29 |
A252 | 8 | 200 | 252 | 8 | 200 | 252 | 3.95 | 45.50 | 22 |
A393 | 10 | 200 | 393 | 10 | 200 | 393 | 6.16 | 70.96 | 14 |
steel reinforcement mesh SIZES DETAILS (3.6m x 2.0m)
BS Ref. | Size (mm) | Pitch (mm) | Area (mm2/m) | Size (mm) | Pitch (mm) | Area (mm2/m) | Kg/m² | Kg/sheet | Sheets per Tonne |
A142 | 6 | 200 | 142 | 6 | 200 | 142 | 2.22 | 15.98 | 62 |
A193 | 7 | 200 | 193 | 7 | 200 | 193 | 3.02 | 21.74 | 45 |
A252 | 8 | 200 | 252 | 8 | 200 | 252 | 3.95 | 28.44 | 35 |
A393 | 10 | 200 | 393 | 10 | 200 | 393 | 6.16 | 44.35 | 22 |
Reinforcement steel mesh features:
- Improve the quality of reinforcement engineering
- Increase construction speed.
- Enhance the crack resistance of concrete.
- Has better comprehensive economic benefits.
Application of reinforced mesh:
- Beams and columns,
- roofs and walls,
- concrete pavements,
- bridge decks,
- airport and railways,
- tunnel linings,
- box culverts,
- quay floors,
- prefabricated components
IN ADDITION, DELIVERY TIME
MOQ | 1*20GP or 1*40GP |
Delivery time | As regular 20-30 days |
Vessel time | To South Asia 25-30 days, To Mid East 30-35 days, To Africa and South America, 60-65days. |
Shipping line | ESL, PIL, MOL, OOCL, HMM, COSCO, CSCL, EMI, EMC, CMA, MSK, |