GALVANIZED ROOFING SHEETS
1.Galvanized roofing sheets Definition:
The corrugated Galvanized roofing steel sheets (the floor steel deck )is the permanent upholding slabs used in the steel structure buildings, formed by zinc-coating steel sheet to berolled and cold bended.
Floor decking plate Steel Floor Decking/0.6-1.2mm/floor decking sheet/galvanized
2. Specialities:
(1) Light weight, high strength, good bearing performance, good anti-seismic performance
(2) Easy and quick construction, simple assembled
(3) To replace the traditional templates and improve shortcomings of traditional templates;
(4) As part of the structural strength, to reduce the materials cost
(5) Easy reinforcement, wiring, piping construction
(6) Neat and nice looking
3. Use
The products are widely used in steel structure buildings, such as multi-layer and high-rise steel structure housing.
Power plants, exhibition centers, the airports, railway stations, sports stadiums, concert halls, theatres, large supermarkets, logistics centers and Olympic venues.
Product Name | Roof sheet, Galvanized roofing steel sheets |
Base Material | Galvanized Steel, Galvalume Steel and PPGI |
Standard | AISI, ASTM, BS, DIN, GB, JIS, etc |
Grade | SGCC, DX51D+Z etc |
Thickness | 0.14-1.2mm |
Effective Width | 600-1100mm |
Length | up to client option |
Zinc Coating | 60g/m2-275g/m2 |
Packing Details | waterproof paper+edge protector or iron packing+bundling , or as per customers request. |
Brand | BEST |
Payment | T/T, L/C |
Delivery Time | 15-30 days |
Min Order | 1000square meter |
FURTHERMORE, PAYMENT TERMS
- Normally 30% as deposit, 70% balance against BL Copy at sight.
- Letter of Credit is accepted also. But 30% deposit is necessary as well.
- Cash against Documents, which called CAD also ok.
- IF smaller amounts, we prefer paid before loading containers. By Cash, TT, West Union, Moneygram, Paypal.
IN ADDITION, DELIVERY TIME
MOQ | 1*20GP or 1*40GP |
Delivery time | As regular 20-30 days |
Vessel time | To South Asia 25-30 days, To Mid East 30-35 days, To Africa and South America,60-65days. |
Shipping line | ESL, PIL, MOL, OOCL, HMM, COSCO, CSCL, EMI, EMC, CMA, MSK, |